Prefabrication can save time:
- Key components are assembled offsite, reducing the amount of time spent on a project from weeks to days.
- Preplanning is essential to saving time. The project manager and prefabrication manager can review the drawings together, make changes, and plan ahead.
- The days of weather negatively affecting your schedule are over, since most of the assembly takes place in a controlled environment.
- The product can be built and stored ahead of schedule. “Just in Time” delivery has the product on-site, on-schedule, exactly when it’s needed.